A project-finance modeling platform for renewable energy. It turns weeks of fragile spreadsheet work into a validated, investment-grade model, cash waterfalls, debt structures and returns, computed in 173 milliseconds.
Sponsors, developers and bankers structured PV + battery projects in sprawling Excel files: slow to build, easy to break, and impossible to audit line by line. A single wrong assumption could sink an IRR, a DSCR covenant or a whole financing round, and nobody could re-run a scenario without rebuilding the sheet by hand. MijAi needed to make project finance fast, reproducible and bankable.
Hour-by-hour dispatch for solar and battery storage, with round-trip efficiency, degradation and grid limits modeled explicitly.
Full project cash flows, debt sculpting and covenant analysis feeding IRR, NPV and DSCR, no manual rebuilds.
Israel's 800-Hour LV regulation and the peak-window bonus are built into the engine, not bolted on afterwards.
Live KPIs recompute the moment an input changes, compare sizings and strategies side by side in real time.
A 4-phase derivative-free search finds Max Footprint, Max Equity IRR and Max NPV configurations automatically.
Eight-sheet investment-committee Excel exports plus shareable, audit-logged read-only links with revocation.
Benchmarked on a real deal, 763 kWp PV, 2,610 kWh storage, MijAi reproduced the audited 21.03% IRR within ±0.6% of the reference Excel, while turning a multi-week modeling exercise into a sub-second recompute.
14-day trial · 1 user · 3 projects. Everything you need to model your first deal.
Billed annually · unlimited projects · up to 5 seats. The workhorse for active desks.
SSO / SAML, on-premise options and API access for institutional workflows.
Engineered, not estimated, with the audit trail to prove it.
Explore MijAi ↗